In this phase, the system is fully tested by the client community against the
requirements defined in the analysis and design stages, corrections are made as required,
and the Production system is built.
The team must include specific expertise in the business area addressed by the system,
to ensure that the system provides the required functionality.
Test Results and Error Reports
These are the documented results of each test, and the reports returned to the developers
describing the problems discovered during testing. A formalized procedure should be
followed for communicating results of tests and corrections of known problems back and
forth between the client community and developers. These reports are part of that formal
procedure. No sample or template is currently available for these reports. |
  |
User Acceptance Sign-off
This is a form, signed by the project sponsor, that indicates that the
system, documentation, and training materials have passed all tests within acceptable
margins. There is no sample available at this time. |
  |
Production System
This is the actual production system, including the online help. Any
problems identified during User Acceptance Testing are corrected in the development
system, which is then used to create the production system. |
|
Final Installation Procedures and Instructions
These are the procedures that will be used to install the system in the
production environment, including client workstations, as needed. |
|
Final Documentation and Training Materials
Tested and updated user documentation and training materials are
finalized during user acceptance testing, and can be sent to Printing & Mailing for
distribution to the project sponsor, if necessary. These materials need to be available as
soon as the production system is installed. |
|
Project Plan (updated)
A phase section for the Installation, Implementation, and
Post-Implementation Review phase is added to the project plan to show the work breakdown
structure and schedule for the phase. At this time, no sample is available. |
  |
Methodology Compliance Form
This form is initialized by the project team, and completed by a
methodology representative who has reviewed the project documentation and found it
acceptable. It is completed in Word. At this time, no sample is available. |
  |